| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Fin Tube |
|---|---|
| Brand Name: | Yuhong |
| Model Number: | 16mm ASTM A179 Embedded Finned Tube |
| Certification: | ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
| Place of Origin: | CHINA |
| MOQ: | 100KGS |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 800 Tons/ month |
| Delivery Time: | 20-80 |
| Packaging Details: | Ply-wooden Case /Iron Case/ Bundle with plastic Cap etc. |
| Standard: | ASTM A179 |
| Tube material: | Carbon Steel,Stainless Steel |
| Color: | Metal Color |
| Fin material: | carbon steel pipe with aluminium spiral fin |
| Fin pitch: | 2-14mm |
| Fin height: | 16mm max |
| Type: | Fin Tube Heat Exchanger Tube,Stainless Steel Heating Equipment |
| Application: | Heater Parts,Refrigeration Parts,heat exchanger,Cooler,Fluid Cooling |
| Packing: | steel frame,wooden,iron steel frame wooden case,In Crate,etc |
| Company Info. |
| Yuhong Group Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Embedded G Type Finned Tube ASME SA179 Seamless Carbon Steel Tube for Air Coolers
TUBES SPECIFICATIONS
| Standards | ASTM, ASME and API |
| Size | 1/2” NB to 36” NB |
| Thickness | 3-12mm |
| Schedules | SCH 40, SCH 80, SCH 160, SCH XS, SCH XXS, All Schedules |
| Tolerance | Cold drawn pipe: +/-0.1mm Cold rolled pipe: +/-0.05mm |
| Craft | Cold rolled and Cold drawn |
| Type | Seamless / ERW / Welded / Fabricated |
| Form | Round Pipes/Tubes, Square Pipes/Tubes, Rectangular Pipe/Tubes, Coiled Tubes, “U” Shape, Pan Cake Coils, Hydraulic Tubes |
| Length | Min 3 Meters, Max18 Meters, or according to customer’s requirement |
| End | Plain End, Beveled End, Treaded |
Chemical Composition (%) Max.
| C | Mn | P≤ | S≤ | Si≤ |
| 0.06-0.18 | 0.27-0.63 | 0.035 | 0.035 | 0.25 |
Mechanical properties
| Tensile Strength(Mpa) | Yield Strength(Mpa) | Elongation(%) | Hardness(HRB) |
| 325 Min | 180 Min | 35 Min | 72 max |
G Type Embedded Spiral Finned Tube
G-type embedded spiral finned tube is made by machining a steel
strip of a certain width and depth of spiral groove on the steel
pipe, and then the steel strip is set on the steel pipe by
equipment. During the winding process, the steel band will be
firmly wound in the spiral groove because the preload force reaches
a certain level to ensure a certain contact area between the steel
band and the steel tube. In order to prevent the steel belt spring
from falling off from the optical tube, both ends of the steel belt
need to be welded to the steel tube. In order to facilitate the
setting, there should be a certain gap between the steel belt and
the spiral groove. If the gap is too small, the commissioning
process will be difficult to proceed smoothly.
In addition, there will always be a certain amount of springback in
the wound steel strip, which prevents a good bond between the strip
and the bottom of the spiral groove. Inlaying fins can be done on
general equipment and at a very low cost. Our company adopts
advanced production equipment in McElroy Company in the U.S.A. The
advanced technology of slotting and pre-embedding, good
self-stabilization, firm pre-embedding, pull-off force of not less
than 70n, and the permissible temperature of up to 400℃, with
strong resistance to temperature and thermal shock, are widely used
in petrochemical air coolers.
Application
For a rapid quotation, plz send with following requirement
Number of pieces,
base tube: Diameter, thickness, length and material specification.
Fins: material specification, type (solid or serrated), height, thickness, spacing, finned length and unfinned sections. Weld prep details if required.
Delivery period required.
Payment term.

This drawing shows the detais we need.

|