| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Potato Processing Machine |
|---|---|
| Condition: | New |
| Applicable Industries: | Hotels, Food & Beverage Factory, Restaurant, Food Shop, Food & Beverage Shops |
| Showroom Location: | None |
| Video outgoing-inspection: | Provided |
| Machinery Test Report: | Provided |
| Marketing Type: | New Product 2020 |
| Warranty of core components: | 1 Year |
| Core Components: | Engine, Bearing, Motor |
| Brand Name: | HDF |
| Place of Origin: | Henan, China |
| Voltage: | 220V-50HZ |
| Power: | 500W |
| Dimension(L*W*H): | 463X327X449mm |
| Weight: | 7kg |
| Warranty: | 2 years |
| Application fields: | Snack food factory, Fruit processing plant, Vegetable processing plant |
| Raw material: | Fruit, Vegetables |
| Output product name: | Vegetable cutting machine |
| Key Selling Points: | Low Maintenance Cost |
| Type: | Cutter |
| After-sales Service Provided: | Engineers available to service machinery overseas, Online support |
| name: | Lemon slicer |
| Application: | vegetable slicer machine |
| Function: | electric potato cutting machine |
| Material: | 304 stainless steel |
| Cutting size: | 2mm/5mm/7mm (adjustable) |
| Product function: | slicer |
| thickness of the slice: | 0-10MM |
| After Warranty Service: | Video technical support, Online support |
| Local Service Location: | None |
| Certification: | ISO, CE |
| Packaging Details: | International standard wooden case packaging
green leafy vegetable cutter |
| Port: | qingdao/tianjin/shanghai |
| Supply Ability: | 100 Set/Sets per Month green leafy vegetable cutter |
| Price: | $180.00/sets 1-4 sets |
| Company Info. |
| Henan Huafood Machinery Technology Co.,Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |

Name | Machine Size (mm) | Weight (kg) | Output (piece/time) | Power/Voltage (w/v) | Blade type | Thickness of the slice |
Lemon slicer | 463X327X449mm | 7kg | 10piece/time | 500w 220V-50HZ | 2mm/5mm/7mm | 1-10mm |








Delivery Way | Delivery Time |
By air | About10-20 days days after leaving the port |
By sea | About20-30 days days after leaving the port |



|