| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Metal Lockers |
|---|---|
| Place of Origin: | Luoyang,Henan, China |
| Brand Name: | CBNT |
| Model Number: | 3L-B4 |
| Certification: | ISO9001/14001/18000/BV |
| Supply Ability: | 20000 Piece/Pieces per Month Steel Parcel Locker |
| Packaging Details: | Five layers wooden paper / Foam paper / EPE / Foam blocks / Bubble Wrap/Packing belts 1. Foam paper protect each piece. 2. Foam board fill the gap in every level. 3. Bubble Wrap or PE foam on the top. 4.5ply standard export carton, seal wit |
| MOQ: | 50 Unit/Units |
| Price: | negotiable |
| Payment Terms: | T/T, L/C |
| Delivery Time: | 15days~30days |
| Brand: | CBNT/ OEM & ODM accepted |
| Size: | W900*D450*H1850mm |
| Color: | customized |
| Lock: | Cyber lock, Handle lock |
| Thickness: | 0.5-1.0mm before painting |
| Surface: | Electrostatic Powder Coating |
| Usage: | School&Office&Public |
| MOQ: | 50pcs |
| keyword: | Factory Price Small Stadium Lockers Metal Storage |
| Port: | Qingdao Port, China |

![]()
Small Stadium Full Height Lockable Steel Wardrobe LockerSteel Parcel Locker
| PRODUCT SPECIFICATION | |
| Item No. | 3L-B6 |
| Brand | CBNT |
| Size | W900*D450*H1850mm |
| PACKING | |
| Packing volume | 0.176cbm |
| Packing | 1 Sets/CTN, Five layers wooden paper/ Foam paper/ EPE/ Foam blocks/ Packing belts |
| Color | Gray, Orange, RAL color, Customized |
| Thickness Regular | Nomal 0.6mm ; 0.5-1.2mm available |
| CERTIFICATIONS | |
| ISO9001/14001/18000 Or other test reports according to customers’ demand. | |



*The folded craft make the edge more solid and thicker.
*The rubber belt and fixer reduce glass shaking and breakage
probability.
*Cushion is used to reduce the friction and noise.
*4 adjustable shelves are standard configuration.
*Reinforcing rib welded on back of shelves and doors.
PRODUCTS ADVANTAGES
1. Waterproof, fireproof, corrosion resistance.
2. Sturdy construction, wear resistance, high load bearing.
3. Easy to install, clean and maintain
4. QC in every procedure, 3 times inspection before packing, 1 time
spot check before loading.
5. Hygienic, environmental friendly
6. High efficiency and perfect after-sale services
7.Simple side pull design ,with comfortable feeling
8.High quality Nylon Casters ,Loading weight 100kgs.Smooth and silent
SUPPLY ABILITY AND TRADING TERMS
Terms of payment
1.T/T,30% deposit in advance, the balance opon the B/L copy
2.Small quantity for trail order allowed
3.Production Ability 20000sets/month
4.Small quantity for trail order allowed
LEAD-TIME
1.Peak time15-30days, leisure time 20-30days after receiving your deposit
APPLICATION
Office / school / home / hotel / Hospital / Company / Factory
|