| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Automotive Plastic Injection Mouldings |
|---|---|
| Brand Name: | OEM |
| Model Number: | Automotive Plastic Injection Mouldings |
| Certification: | SGS |
| Place of Origin: | dongguan,china |
| MOQ: | 500 |
| Price: | Negotiable |
| Payment Terms: | T/T |
| Supply Ability: | 700pics/per day |
| Delivery Time: | 25days |
| Packaging Details: | Carton(61*29*47cm) |
| Material: | PA66+GF |
| Shaping Mode: | Injection Mould |
| Application: | Car |
| Mould Cavity: | Single Cavity |
| Color: | Blue |
| Lifetime: | 5 years |
New Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling
Specifications:
| Name | New Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling |
| Material | PA66+GF |
Dimension | Customized |
| application | car battery |
Working Temperature | -20~200℃ |
| Surface Treatment | sandy finish |
Housing Color | Black/Blue |
Standard | LKM |
| Weight | 510g |
| Mould Precision | +/-0.05mm |
| Certificate | ISO |
package | Carton(61*29*47cm) |
| Production Capacity | 5000/month |
Life span | 500000/2yrs |
| Origin | dongguan china |
Plastic Mold (Moulds) production process | Description |
| 1. 3D Design/Samples for quotation | According to 3D drawing or samples for quotation. |
| 2. Negotiations | Including the price of molds, molds sizes, material for cores & cavities, weight of product, part cost, payment, mold lifetime, delivery, etc. |
| 3. Purchasing Order | After the customer confirming the mold design and quotation. |
| 4. Making mold(moulds) | Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start production. |
| 5. Production schedule | Every week we will feedback to the customer a mold progress(picture). |
| 6. sample shoot | We provide the molds test samples for confirmation (about 10-15 piece), then, get your signature sample, mass production. |
| 7. Package | Wooden case for moulds, cartons for parts, or as your requirement. |
| 8. Delivery | deliver goods by air or by sea. |

FAQ
Q:What is your company superiority?
A:First,we have 23 years plastic mould and parts customized experiences,Second,we have efficiency with 90 personnel and first-rate-facilities.Third,our staff would treat all customer welcoming,Fourth we can make plastic parts that other companies might not to make.Fifth,our price is favorable.
Q:How is your efficiency?
A:We need 30 days around to make plastic parts and mould,and need 7 days around to send the products to you.
|