Sign In | Join Free | My benadorassociates.com |
|
Categories | Pipe Threading Machine |
---|---|
Brand Name: | SUNTECHMACH |
Model Number: | Z1T-R2 |
Certification: | CE ISO |
Place of Origin: | ZHEJIANG, CHINA |
MOQ: | 1 set |
Price: | USD270.00/SET |
Supply Ability: | 80000PCS/MONTH |
Delivery Time: | 5-8 working days |
Packaging Details: | Wooden case |
Product Name: | PIPE THREADER PIPE THREAING MACHINE |
Chaser set: | 1/2"-3/4", 1"-2" |
Motor power: | 750w |
Speed: | 24rpm |
Thread type: | NPT or BSPT |
Package: | 1wooden case/set |
G.W/N.W.: | 75/58KGS |
Packing size: | 700*480*540mm |
Company Info. |
Hangzhou Suntech Machinery Co, Ltd |
Verified Supplier |
View Contact Details |
Product List |
Oridinary competitive price pipe threading machine for 1/2inch to
2inch 750W 24RPM
Pipe threading Machine
Pipe threading machine is applicable in cutting,carving thread and
inner hole chamfering varieties inches tubes for purpose of
water.electric and gas.
Keywords: bolt threading machine price,rod threading machine price,
automatic threading machine price, threading machine manufacturers,
metal threading machine, small threading machine, threading machine
price, pipe threading machine, electric pipe threading machine,
Iron pipe threading machine, steel pipe threader, stainless steel
threading machine, pipe threading machine, electric pipe threading
machine,
Specification
Model: ZT-R2
Pipe Capacity: 1/2"-2"
Dies: 1/2"-3/4", 1"-2" BSPT/NPT
Spindle Speed: 25RPM
Motor: 220V/380V Universal Motor 50HZ
Power: 750W
Gross Weight: 86Kg
Packing Size: 750*550*580(mm)
Working principle of threading machine
Installation
1. Check if all parts and accessories are in good condition
including tool bag, oil, tooth, tooth holder and support legs.
2. Lift the device and fix the legs, then tighten the screws of the
legs evenly
The back head should be slightly higher than the hammer head to
ensure the cooling oil flow.
3. Clean the oil from the teething and add some grease to the
places of movement.
4. Make sure the machine is working properly before starting and
make sure the oil is pumped.
5. Install each moving part when you want to move the machine to
another work area. The dental head must be locked in place, and a
short tube placed in the head.
Operation manual
1. Catch tubes
1) Expand the thread head to enter the tubes from the compressor
shaft side.
2) At first close the rear head, then close the front head to catch
the tubes, check the three jaws of the head from the front head and
on normal use, jerk the knocking head toward yourself to lock the
tube.
3) Move the front head in the opposite direction to unscrew the
tube after completion.
4) If you are using a short tube so that it does not reach the back
jaw, just insert the tube towards the head of the teeth and lock it
with the teeth, then insert the supporting head to fix the tube.
2. Teething
1) Lift the cutter out of the way and bring the tooth head into the
working position.
2) Turn on the switch to make the machine work. Apply pressure to
the sliding handle until three or four threads are cut. Then
release the sliding handle, the normal teething will be cut off
automatically. When an appropriate amount of placements are cut.
3. Tube cutting
1) Put the pipe cutter in the working position.
2) Turn the sliding handle to make the pipe cutter to the point you
want to cut.
3) Turn the cutter handle tightly.
4) Turn on the switch. Then turn the cutter handle slowly and
tightly as it cuts from the tubes.
5) After cutting the tubes, release the cutter handle and raise the
tube cutter.
4. Enlargement
1) Make the lathe head in the working position.
2) Lock the lathe head.
3) Turn on the switch. Adjust the slide knob to bring the lathe
head into the tubes.
4) Cut off the electricity. Return the lathe head to its normal
position
Application & Details:
Our service:
1. How to get a accurate quotation from us?
Provide us the detail of the material such as metal thickness and
width.
2. What’s the shipping cost from China to your country?
We can send machine to your port or door address by sea or
airplane. Please kindly tell us your nearest port or address with
postcode.We have reliable shipping agent to insure the safe,
convenient and timely delivery.
3. Payment terms, MOQ, warranty, FOB?
Payment terms: 30% TT paid in advance, the balance of 70% before
the shipment.
Minimum order quantity: 1 set.
FOB :Shanghai.
Delivery time :7 days after receipt of formal order and 30%
deposit.
Warranty:12 months.
4. What’s the package?
Fumigation-free plywood case or without package.
5. What about commissioning service?
We can offer commissioning service, the buyer need to afford plane
tickets.
6. What’s policy for guarantee and broken parts?
Warranty period of equipment lasts a year, during which the broken
parts and spares caused by quality can be offered free.
7.Any question, call us or send email, we will try our best to
satisfy you.
![]() |