| Sign In | Join Free | My benadorassociates.com |
|
| Categories | New Energy Automotive Training Equipment |
|---|---|
| Brand Name: | Zhongcai |
| Model Number: | BYD E5 ZC-QCG52B |
| Certification: | ISO9001/CE |
| Place of Origin: | Guangdong,China |
| MOQ: | 1 |
| Price: | Negotiable |
| Payment Terms: | T/T |
| Supply Ability: | 1000 |
| Delivery Time: | 15-25Work Days |
| Packaging Details: | Wooden Box |
| Features: | Simulates real-life automotive systems and components for training purposes |
| Power Source: | Electricity |
| Voltage: | 220V |
| Color: | Customized |
| Application: | Automotive Industry |
| Components: | Battery, control unit, sensors, wiring, etc. |
| Company Info. |
| Guangdong Zhongcai Education Equipment Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
This Drive Motor Educational Equipment adopts a complete new energy vehicle drive motor assembly (with all accessories) mounted on a dedicated rotating frame. Equipped with a deceleration rotation mechanism, the motor can be rotated 360° and locked at any angle, allowing students to perform disassembly and assembly from multiple perspectives. The frame is constructed with high-strength steel welding and features a spray-coated surface for durability and rust resistance.
| Parameter | Specification |
|---|---|
| Dimensions (L×W×H) | 1000×600×1100mm |
| Steel Tube Specs | 60×40×3mm (High-strength welded) |
| Caster Configuration | 2 lockable swivel casters (front), 2 swivel casters (rear) |
| Caster Size | Ø60mm × 50mm (Diameter × Width) |
| Caster Mounting | Fixed with M6×4 screws for easy maintenance |
| Reducer Model | MOPA70, Reduction Ratio 1:70 |







FAQ
Q1: Are you a trading company or manufacturer?
We are a manufacturer, our equipment is superior in quality and
reasonable in price.
Q2: May we visit your factory?
Yes, welcome to our factory, our factory is in China Guangzhou
City, it is near the Guangzhou Baiyun airport, very convenient to
come here.
Q3: How to ensure the quality?
Our technicians are experts in this industry.Each assembly part has
a controller to ensure stable operation of the equipment.
Q4: What is the warranty period and the delivery period?
Warranty period:12 months Delivery period: Usually 30 days
Q5: What is you terms of payment?
50% in advance, balance before shipment, we accept T/T, Cash.

|