| Sign In | Join Free | My benadorassociates.com | 
              
  | 
      
| Categories | Heat Exchanger Tube Bundle | 
|---|---|
| Brand Name: | YUHONG | 
| Model Number: | CARBON STEEL TUBE BUNDLE | 
| Certification: | ASME, ASTM, ASME U Stamp | 
| Place of Origin: | CHINA, KOREA | 
| MOQ: | 1 SET | 
| Price: | 0-1000000USD | 
| Payment Terms: | T/T, L/C, D/A | 
| Supply Ability: | 15 SETS/MONTH | 
| Delivery Time: | 30-60DAYS | 
| Packaging Details: | Wooden export crates | 
| Tube: | ASME SA213 TP316L | 
| Tubesheet: | ASTM A350 GRADE LF2 CLASS 1 | 
| Baffles: | A/SA 516 Gr.70+N | 
| Rods: | ASTM A194 Grade 2H | 
| Spacers: | ASME SA213 TP316L | 
| Support Plate: | SA516 GR.70N | 
| Company Info. | 
| Yuhong Group Co.,Ltd | 
| Verified Supplier | 
| View Contact Details | 
| Product List | 
TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII
TEMA Class R Carbon Steel Heat Exchanger meets stringent ASME Section VIII and TEMA standards which ensures safety, reliability, and long-term performance in demanding industrial environments.
1. Advantages of Carbon Steel Tube Bundles
| Feature | Benefits | 
|---|---|
| Cost-Effective | Reducing project costs. | 
| High Mechanical Strength | Suitable for high-pressure applications. | 
| Thermal Conductivity | Efficient heat transfer properties. | 
| Weldability | Easier to fabricate and repair. | 
| Corrosion Resistance (with HIC) | Resist degradation in wet H₂S environments. | 
| Versatility | In oil & gas, petrochemical, and power generation. | 
2. ITP (Inspection and Test Plan) for Carbon Steel Tube Bundles
| Step No. | Stage | Acceptance Criteria | Witness/Review | 
|---|---|---|---|
| 1 | Raw Material Inspection | ASTM or ASME standards | QC, Third-Party Inspector | 
| 2 | Tube Dimensional Check | Per design drawings and tolerances | QC | 
| 3 | Tube Sheet Inspection | As per ASME Sec VIII requirements | QC | 
| 4 | Tube-to-Tube Sheet Welding | ASME Sec IX standards | Third-Party Inspector | 
| 5 | Baffle and Support Assembly | TEMA Class R specifications | QC | 
| 6 | Hydrostatic Testing | No leakage or pressure drop | Authorized Inspector, Client | 
| 7 | Final Inspection | TEMA standards | Client, Third-Party Inspector | 
| 8 | Documentation Approval | Complete and accurate documentation | Client, QC | 
3. Hydrostatic Testing Requirements and Procedure
Key Requirements:
Testing Procedure:
Preparation:
Pressurization:
Hold Period:
De-pressurization:
Post-Test Inspection:

                                 
                             |