| Sign In | Join Free | My benadorassociates.com |
|
| Categories | High Rise Steel Structure Building |
|---|---|
| Brand Name: | China CT steel structure |
| Model Number: | High Rise Building006 |
| Certification: | SGS |
| Place of Origin: | china |
| MOQ: | 500Square meters |
| Price: | USD160 Square meters |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 200,000 Tons/ Year |
| Delivery Time: | 3-5weeks |
| Packaging Details: | Single package size: 1200 x 200 x 200 cm |
| Product name: | Commercial Center High Rise Steel Structure Building Anti Rust Customizable |
| Material: | Q235/Q345,Q235,Q345 Low Carbon Steel,Color Steel,Q235/Q235B/Q345/Q345B |
| Door: | Steel Door,Sliding door/Rolling door,Rolling door or sandwich panel door,rolling up gate,Sliding Door or roller door |
| Roofing: | Sandwich Panel. Single Steel Sheet,EPS sandwich panel |
| Column: | Welded H Steel,welded H beam,H galvanized steel |
| Beam: | H Steel available,Steel Pipes,Angle Steel,Welded/ Hot rolled H beam |
| Company Info. |
| China CT Steelstructure Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Commercial Center High Rise Steel Structure Building Anti Rust Customizable
Product Description:
Steel structure high-rise buildings have become the landmark architectural form of modern urban skylines because of their high strength, lightweight and flexible spatial adaptability. The following is an analysis from the dimensions of structural characteristics, technical advantages, design challenges and typical applications, and its core values are presented combined with engineering practice and technical details.
Product Advantages
1. Outstanding material strength:The tensile strength of steel reaches 345 - 460MPa (such as Q355B), which is more than 20 times that of concrete. The cross-section of the member is smaller under the same load. For example, the diameter of steel columns in a 30-story building is about 600mm, while the diameter of concrete columns is about 1200mm, which can save 5% to 8% of the building area.
2. Prefabrication shortens construction period:The factory prefabrication accuracy of steel components reaches ±2mm, and the on-site bolt assembly efficiency is three times higher than that of concrete pouring. The construction period of the main structure of the 300-meter-high-rise building is about 24 months, which is 12 months shorter than that of traditional concrete structures.
It can realize "synchronous construction above and below ground": synchronous hoisting of above-ground steel columns during underground foundation construction, shortening the total construction period by 30%
3. Maturity of wind and earthquake resistance technology:Wind-resistant design: Equipped with a tuned mass damper (TMD) to counteract wind vibrations.The streamlined steel structure facade can reduce the wind load by 30%.
Seismic technology: Use energy dissipation members such as buckling restrained braces (BRBs) and friction dampers,The "strong joint and weak member" design ensures that the bearing capacity of the joint is 1.2 times higher than that of the member, avoiding earthquake rupture.
4. Low-carbon, energy-saving, recycling:
The construction process has less pollution, and construction waste is reduced by 90% compared with traditional processes, which is in line with the concept of green building.
Product Attributes
| Column & Beam | Welded or Hot rolled H-section |
| Main Steel | Q355, Q235, Q355B, Q235B, etc. |
| Connection method of steel structure | Welding connection or bolt connection |
| Anti-rust protection | Hot-dip galvanized or anti-rust painting |
| Purlin and girts | Cold-rolled C or Z steel, Q355 or Q235 |
| Door | Rolled up door or Sliding door |
| Wall & Roof | Sandwich panel or steel sheet. |
| Surface | Hot-dip galvanized or painted |
| Window | Plastic steel or Aluminum alloy window |
Transport Specifications
| Package Size | 100.00cm * 100.00cm * 100.00cm |
| Package Gross Weight | 100.000kg |
Product Use
1. logistics industry: In logistics hubs and distribution centers, steel structure warehouses play a central role. Its large-span space can accommodate a large number of cargo pallets of different specifications, making it convenient for forklifts and other handling equipment to quickly shuttle and efficiently carry out cargo loading, unloading, sorting and storage. For example, in the regional logistics center of large e-commerce, through the rational layout of multi-layer steel structure shelves, the classified storage of large quantities of goods is realized. With the advanced automated sorting system, the efficiency of goods turnover is greatly improved and the e-commerce business is met. Rapid distribution needs. Moreover, the flexible space design of the steel structure warehouse can flexibly adjust the size of the storage area and sorting operation area according to fluctuations in logistics business volume during the peak seasons.
2. manufacturing: In various manufacturing plants, steel structure warehouses are used for the storage of raw materials, parts and finished products. Taking automobile manufacturing companies as an example, steel structure warehouses store a large number of raw materials from steel and rubber to various precision parts. Their high strength and high carrying capacity can support heavy shelves and be used to store large and heavy automobile parts. At the same time, in the finished product storage area, a large-space steel structure warehouse can orderly park complete vehicles waiting to be transported, ensuring smooth connection between production and logistics. For electronic manufacturing companies, due to the high requirements for the storage environment of products, the good thermal insulation, heat insulation and waterproof properties of steel structure warehouses can provide a stable temperature and humidity environment for electronic components and finished products, and prevent static electricity and humidity from causing damage to products.
3. agricultural field: In terms of agricultural product warehousing, steel structure warehouses are widely used. For grain storage, its spacious space can be used to build large granaries. By installing ventilation and temperature control equipment, and taking advantage of the good thermal insulation performance of the steel structure warehouse, the appropriate temperature and humidity in the warehouse are maintained to prevent grain mildew and pests, and extend grain storage. period. In the producing areas of agricultural products such as fruits and vegetables, steel-structure warehouses serve as pre-cooling and fresh-keeping storage places. Together with refrigeration equipment and the insulation characteristics of color steel plates, they can quickly reduce the temperature of agricultural products and maintain a low-temperature environment, maintain the freshness of agricultural products, and reduce postpartum losses. In addition, steel structure warehouses can also be used for the storage of agricultural machinery and agricultural materials. Their solid structure can withstand the severe weather common in rural areas.
Product Picture


Company Introduction

![]()
China CT Steel Structure Group Co., Ltd is a comprehensive
industrial group that integrates steel structure research and
development, design, manufacturing, production, and installation.
Since its establishment in 2004, it coversan area of approximately
300000 square meters and produces 200000 tons of steel structures
annually. We have over 500 well-trained employees, more than 100
professional design teams, after-sales service teams, and many
advanced equipment.
The company has 30 steel structure production lines, specializing
in the design, manufacturing, and installation of industrial and
civil buildings such as steel structure factories, warehouses,
high-rise steel structure buildings, office buildings,
exhibition,halls, sports halls, parking garages, prefabricated
houses, and agricultural projects. We are committed to providing
customers with innovative solutions that not only meet their
expectations, but also exceed them.


The quality control measures of steel structure project are as
follows:
1, Strengthen the management of technical personnel
In the construction process of the construction site, the
construction personnel occupy the main position in the steel
structure operation.In this case, it is necessary to carry out
specialized management for the participants of steel structure
projects.In the actual management of steel structure project
participants, it is found that the actual management work often
fails to achieve the expected effect.Firstly, due to the uneven
level of professional knowledge and comprehensive quality of the
construction personnel involved in steel structure construction,
they are not specialized steel structure construction
personnel.Secondly, there are many problems in the management of
steel structure construction personnel.The employees have loose
attitude and poor discipline, which is not easy to be managed in a
unified way.Facing this problem, the construction unit should
formulate a corresponding management system to restrain them, and
should not use conventional management methods.In addition, the
pre-service education and training of employees should be
strengthened to give full play to the enthusiasm of employees so
that they can naturally comply with the rules and regulations.
2, improve the construction control mechanism
In the process of engineering construction, more attention should
be paid to the construction of construction quality control
mechanism, to ensure the overall quality of engineering
construction by perfecting the construction mechanism.First of all,
the relevant units should improve the existing construction quality
management mechanism, combine the problems that may occur in
different construction links, and establish corresponding
management and processing mechanisms.Secondly, pay attention to the
construction supervision of steel structure.In the process of steel
structure construction, many different types of problems may be
encountered, and the corresponding processing mechanisms may be
different.In order to save the construction time and reduce the
construction difficulty, some construction personnel may adopt
unreasonable construction methods in the construction process, but
these methods cannot meet the construction requirements.Under the
supervision of the supervisory unit.All the work can be carried out
scientifically and reasonably, the probability of non-standard
construction problems is greatly reduced, and the overall quality
of the steel structure can be effectively guaranteed.The
construction party should establish a sound supervision and
management mechanism, encourage the relevant construction personnel
to supervise each other, cultivate their sense of crisis and
rigorous work attitude, and ensure the rationality of construction.
3, Strengthen construction material management
The quality of materials is directly related to the construction
quality and is an important content of construction quality
control.In the construction of steel structure project, the cost of
steel structure material is very high.Strengthening the
construction material management reduces the construction cost
while ensuring the subsequent steel structure construction
activities are carried out in an orderly manner.This requires
comprehensive consideration of construction needs and selection of
high quality and inexpensive materials.Specialists conduct in-depth
market research, compare and analyze the materials, lay the
foundation for more orderly implementation of subsequent steel
structure construction activities, and effectively improve the
construction quality of steel structure projects.
4, Strengthen the quality control of on-site steel structure
components
At the same time, the quality control of on-site steel structure
components should be strengthened.First of all, check the samples
provided by the permanent representatives and supervisors.If any
problem is found, the factory should be notified at one time for
correction and to ensure the quality of steel structure components
can be transported.On the other hand, the steel structural members
need to be inspected by the quality inspector of the supervisory
unit upon arrival at the site.

transport

FAQ
1. Are you manufacture factory or trading company?
We are manufacture factory, located in Qingdao city, near to
Qingdao port. And we have total 7 workshops from steel structure to
wall and roof sheet.
2. Can you provide free design?
Yes, we have 10 senior engineer with rich experience. You only need
to give me youridea, we will design for you with free.
3. Can you offer competitive prices?
If you have no special requirement for the material, we all use
materials from big material manufacture companies. We also can
design it according to your requirement. But no matter what kind of
quotation mode, offering the reasonable
price is our business objective.
4. How to install? Can you provide engineer to help?
We will provide the detail installations , like the CAD, 3D tekla,
etc. Or we will provide the engineers to help according to your
requirement.
5. Can I have a visit to your factory before the order?
Why not? Welcome to visit our factory. You can fly to Fujian
Quanzhou Airport, then we will pick you up at the airport, hotel
booking service is available.
6. ls your price competitive compared with other companies?
A:Our business objectives are to give the best price with same
quality and best quality with the same price. We will do everything
we can to reduce your cost and guarantee you get the best product
that you paid for.
7. Do you accept container loading inspection?
A:You are welcomed to send an inspector, not only for the container
loading, but any time during theproduction time.
8. Do you offer designing service for us?
A:Yes, we could design full solution drawings as your
requirements.By using Auto CAD,PKPM ,3D3S,Tekla Structures (X
steel) etc., we can design complex industrial building like office
mansion, super marker, auto dealer shop,shipping mall, 5 stars
hotel.
9.What is the delivery time?
A:Delivery time depends on order quantities.In general, the
delivery time to nearest seaport in China will be 30 days after
receiving deposit.
10.How can you get a quotation for your projects?
A:You can contact us by email, phone, TM, WhatsApp and so on 24*7
and you will get reply within 8 hours. Firstly, please send us your
project details and your requirements. Then we will design
accordingly, free of charge.Afterwards, please check and confirm
whether you like the drawings. If not, we shall get the drawings
revised until your confirmation.
|