| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Bailey Bridge |
|---|---|
| Brand Name: | Zhonghai Bailey Bridge |
| Model Number: | CB200/CB321 |
| Certification: | IS09001, CE |
| Place of Origin: | China |
| MOQ: | 1 Pcs |
| Price: | USD 95-450 |
| Payment Terms: | L/C,D/P,T/T |
| Supply Ability: | 60000ton/year |
| Delivery Time: | 8-10 work days |
| Packaging Details: | Naked |
| Application: | Bailey Bridge |
| Surface: | Galvanized |
| Name: | Bailey Bridge |
| Net Width: | 3.15m,3.6m,4.2m,7.35m,10.5m |
| Material: | Steel |
| Usage: | Indoor or outdoor |
| Customizable: | Yes |
| Structure Type: | CB100 Steel Bridge |
| Company Info. |
| Jiangsu Zhonghai Bridge Equipment Co.,LTD |
| Verified Supplier |
| View Contact Details |
| Product List |
Top Selling Bailey Bridge/best Quality Bailey Bridge
When constructing bridges in mountainous areas, it is crucial to ensure construction safety. Here are some key safety measures and precautions:
1. Complex geological conditions
- **Detailed geological survey**: Mountainous areas have varied
terrain and complex geological structures, often containing a
variety of rock types and soil structures. A detailed geological
survey must be conducted before construction to identify the
engineering geological characteristics of the proposed site to
ensure the rationality and safety of the bridge foundation design.
- **Geological disaster prevention**: Mountain construction faces
the threat of various geological disasters, such as landslides,
mudslides, rock collapses, etc. Special reinforcement measures,
such as prestressed anchors and pile foundation reinforcement, need
to be taken during construction to ensure the stability and safety
of the bridge.
2. Harsh construction environment
- **Extreme climate response**: Mountain construction often faces
extreme climate conditions, such as severe cold, high temperature,
strong wind, etc. Construction workers need to take corresponding
protective measures and ensure the performance of construction
materials in extreme climates.
- **High-altitude construction**: In high-altitude areas,
construction workers need to deal with altitude sickness, such as
hypoxia, headaches, fatigue, etc. In addition, attention should be
paid to the threat of strong ultraviolet radiation to the health of
construction workers.
- **Narrow construction site**: The complex terrain in mountainous
areas and the narrow construction site bring great inconvenience to
the transportation of materials and the layout of construction
equipment. A detailed traffic organization plan needs to be
formulated to reasonably arrange the route and time of construction
vehicles.
3. High construction technology requirements
- **Precise design and construction**: Mountain bridge construction
requires high accuracy and innovation in bridge structure design,
and precise control during the construction process is essential to
ensure that the bridge can remain stable under extreme climate and
geological conditions.
- **Material and equipment selection**: Construction materials need
to adapt to the climate and geological conditions in the mountains.
At the same time, construction equipment needs to have good
mobility and adaptability to cope with complex terrain.
4. Huge amount of engineering
- **Reasonable planning of construction period**: The amount of
engineering for mountain bridge construction is huge and the
construction period is long. A scientific and reasonable
construction plan needs to be formulated, taking into full
consideration natural factors such as terrain and geology, and
combining the characteristics and difficulties of each construction
stage to formulate a reasonable construction schedule.
- **Fund management**: The construction of highway bridges in
mountainous areas requires more urgent funds. Contractors need to
carefully plan capital operations and allocate resources reasonably
to ensure that the project is carried out in an orderly manner with
sufficient funds.
5. Safety and environmental protection
- **Construction safety**: Construction workers must wear safety
helmets and safety belts, and it is strictly forbidden to work on
the shelves after drinking. When using a crane to lift and remove
Bailey piers, a special person should be assigned to direct the
crane, and it is strictly forbidden for the crane arm to collide
with the Bailey beam and its foundation.
- **Environmental protection**: Construction in mountainous areas
needs to consider ecological protection and environmental
protection issues, such as vegetation protection and water source
protection, to mitigate the impact on the surrounding ecological
environment.
Through the above measures, various challenges in mountain bridge construction can be effectively addressed to ensure safe, efficient and environmentally friendly construction.
Specifications:
| CB321(100) Truss Press Limited Table | |||||||||
| No. | Lnternal Force | Structure Form | |||||||
| Not Reinforced Model | Reinforced Model | ||||||||
| SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
| 321(100) | Standard Truss Moment(kN.m) | 788.2 | 1576.4 | 2246.4 | 3265.4 | 1687.5 | 3375 | 4809.4 | 6750 |
| 321(100) | Standard Truss Shear (kN) | 245.2 | 490.5 | 698.9 | 490.5 | 245.2 | 490.5 | 698.9 | 490.5 |
| 321 (100) Table of geometric characteristics of truss bridge(Half bridge) | |||||||||
| Type No. | Geometric Characteristics | Structure Form | |||||||
| Not Reinforced Model | Reinforced Model | ||||||||
| SS | DS | TS | DDR | SSR | DSR | TSR | DDR | ||
| 321(100) | Section properties(cm3) | 3578.5 | 7157.1 | 10735.6 | 14817.9 | 7699.1 | 15398.3 | 23097.4 | 30641.7 |
| 321(100) | Moment of inertia(cm4) | 250497.2 | 500994.4 | 751491.6 | 2148588.8 | 577434.4 | 1154868.8 | 1732303.2 | 4596255.2 |
| CB200 Truss Press Limited Table | |||||||||
| NO. | Internal Force | Structure Form | |||||||
| Not Reinforced Model | Reinforced Model | ||||||||
| SS | DS | TS | QS | SSR | DSR | TSR | QSR | ||
| 200 | Standard Truss Moment(kN.m) | 1034.3 | 2027.2 | 2978.8 | 3930.3 | 2165.4 | 4244.2 | 6236.4 | 8228.6 |
| 200 | Standard Truss Shear (kN) | 222.1 | 435.3 | 639.6 | 843.9 | 222.1 | 435.3 | 639.6 | 843.9 |
| 201 | High Bending Truss Moment(kN.m) | 1593.2 | 3122.8 | 4585.5 | 6054.3 | 3335.8 | 6538.2 | 9607.1 | 12676.1 |
| 202 | High Bending Truss Shear(kN) | 348 | 696 | 1044 | 1392 | 348 | 696 | 1044 | 1392 |
| 203 | Shear Force of Super High Shear Truss(kN) | 509.8 | 999.2 | 1468.2 | 1937.2 | 509.8 | 999.2 | 1468.2 | 1937.2 |
| CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge) | ||||
| Structure | Geometric Characteristics | |||
| Geometric Characteristics | Chord Area(cm2) | Section Properties(cm3) | Moment of Inertia(cm4) | |
| ss | SS | 25.48 | 5437 | 580174 |
| SSR | 50.96 | 10875 | 1160348 | |
| DS | DS | 50.96 | 10875 | 1160348 |
| DSR1 | 76.44 | 16312 | 1740522 | |
| DSR2 | 101.92 | 21750 | 2320696 | |
| TS | TS | 76.44 | 16312 | 1740522 |
| TSR2 | 127.4 | 27185 | 2900870 | |
| TSR3 | 152.88 | 32625 | 3481044 | |
| QS | QS | 101.92 | 21750 | 2320696 |
| QSR3 | 178.36 | 38059 | 4061218 | |
| QSR4 | 203.84 | 43500 | 4641392 | |
Advantage
Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity

|