| Sign In | Join Free | My benadorassociates.com |
|
| Categories | 316 Stainless Steel Coil |
|---|---|
| Brand Name: | SISLAISHI |
| Model Number: | 300 Series 400 Series |
| Certification: | ISO9001 |
| Place of Origin: | CHIAN |
| MOQ: | 1 Ton |
| Price: | Negotiable |
| Payment Terms: | T/T, Western Union |
| Supply Ability: | 50000 Ton Per Year |
| Delivery Time: | 7-14 days |
| Packaging Details: | Standard seaworthy package |
| Product Name: | Stainless steel coil |
| Model NO.: | ASTM/AISI/ASME/JIS/GOST 201 304 304L 316L 316Ti 30 |
| Specification: | width: 1219mm or as required |
| Surface Treatment: | Pickling |
| Zinc Coating: | 30-275g |
| Width: | 1000, 1220, 1500, 1800 or as Required |
| Length: | 1000-6000mm or as Required |
| Transportation: | by Sea, Air |
| Thickness: | 0.5-6mm or as Required |
| Production Capacity: | 5000 Tons Per Month |
| Company Info. |
| Wuxi Sylaith Special Steel Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Product Description
| Material GRADE | 201, 202, 301, 304, 304L, 316, 316L |
| Standard | ASME, ASTM, EN, BS, GB, DIN, JIS, etc |
| Technique | Hot rolled / cold rolled |
| Raw material source | JISCO,TISCO,BAOSTEEL or as your request |
| Width | 10mm-1250 mm |
| Thickness | 0.1mm-3.0mm |
| Quantity | As your request |
| Surface | 2B, BA, 8K, No.4 No.1, 8K, Mirror finish etc. |
| Packaging | Standard export sea-worthy packing |
| Delivery time | 1-15days |
| Supply ability | S.S HR COIL= 1000 000 TONS/ year, S.S CR COIL= 800 000 TONS/ year, S.S pipe=200 000 TONS/ year |
| Payment terms | L/C, T/T |
| Application range | Pipe/tube making, building material, kitchen sinks/cutlery, baths, elevators, automotive application, industrial application, hardware-tools etc. |
| Surface Finish | Definition | Application |
| 2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry, Construction material, Kitchen utensils. |
| BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction. |
| NO.3 | Those finished by polishing with No.100 to No.120 abrasives specified in JIS R6001. | Kitchen utensils, Building construction. |
| NO.4 | Those finished by polishing with No.150 to No.180 abrasives specified in JIS R6001. | Kitchen utensils, Building construction, Medical equipment. |
| HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building Construction. |
| NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical tank, pipe. |


Surface:
| Surface Finish | Defination | Application |
| 2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry.Construction material, Kitchen utensils. |
| BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction. |
| NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical tank, pipe. |
| HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building construction. |
| 8K | The product have excellent brightness and prefect reflexivity can be the mirror. | Mirror. |








Related products:

Production Process:




OEM Service:


Packaging & Shipping



| Tensile Strength | Yield Strength | Elongation | Hardness | |
| (MPa) | 0.2% Proof (MPa) | (% in 50mm) | Rockwell B | Brinell |
| (HR B) | (HB) | |||
| 515 | 205 | 40 | 92 | 201 |
| 515 | 205 | 40 | 90 | 187 |
| 515 | 205 | 40 | 92 | 201 |
FAQ:
1. What's your MOQ? A:We have no minimum order quantity |
2.What's your payment terms? A: 30% in advance by T/T, 70% will be before shippment basic on
FOB; 30% in advance by T/T, 70% against the copy of BL basic on CIF. |
3. What's your delivery time? A: 5-15 working days send to port after deposit arrival |
4. How long time for your company has been in business? A: We are a gold manufacturer of construction materials for 20
years in steel industry. |
5. Can we visit your factory to check production process and
quality? A: Yes, of course, welcome any time. |
6: Do you have about mill certificate and material componential
analysis report? A:Yes, we have professional quality analysis department. |
|