| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Alumina Ceramic Grinding Balls |
|---|---|
| Brand Name: | HUAO |
| Place Of Origin: | CHINA |
| Packaging Details: | 25kgs Per Bag And 1 Ton On A Pallet/drum,or As Customer's Requirement. |
| Payment Terms: | 100% In Advance/ 30% TT In Advance,Balance Payment Befor Delivery. |
| Material: | Alumina Ceramic |
| Corrosion Resistance: | High |
| Size: | 13mm-90mm |
| Alumina Content: | 92%,95% |
| Color: | White |
| Bulk Density: | ≥3.6 G/cm3 |
| Thermal Conductivity: | 20 W/mK |
| Company Info. |
| Zibo Huao New Materials Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Stable wear value ≤ 0.05% (0.03% for some models), using high-purity alumina and composite additive formula, through bi-directional pressure molding (density ≥ 3.5g/cm ³) and gradient sintering, with a surface hardness of HV1200 or above. Grinding cement raw materials for 30 days, the wear rate is only 0.04%, and the amount of debris decreases from 0.5% of ordinary balls to 0.02%.
| Color | White |
| Water Absorption | ≤0.01% |
| Density | 3.6 G/cm3 |
| Material | Alumina Ceramic |
| Thermal Conductivity | 20 W/mK |
| Shape | Spherical |
| Corrosion Resistance | High |
| Alumina Content | 92%,95% |
| Size | 13mm-90mm |
| Bulk Density | ≥3.6 G/cm3 |
In the grinding of cement raw materials, the amount of debris is ≤ 0.03%, which does not affect the calcination of clinker and helps to increase the compressive strength of clinker from 28MPa to 32MPa in 3 days; When grinding calcium carbonate in the chemical industry, the replacement cycle has been extended from 1 month to 4 months, resulting in a 2 percentage point increase in product whiteness and meeting the demand for high-end coatings.
Company service:
Based on equipment and material parameters, calculate the replenishment cycle and dosage using professional formulas; Adjust the ball replenishment plan based on actual data, help customers optimize inventory and procurement plans, and maximize cost reduction.
Customer concern:
Provide testing reports for the issue of meeting wear standards; For the replenishment cycle, refer to similar customer cases (cement enterprises 30 days/time); Based on the subsequent costs, calculate the benefits of reducing debris (such as a 30% increase in filtration efficiency and a 3-fold extension of filter replacement cycle), and clearly demonstrate the comprehensive value.
|