| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Carbon Steel Rod |
|---|---|
| Brand Name: | HYX |
| Model Number: | ASTM |
| Certification: | CE ISO CNAS CQC SGS |
| Place of Origin: | china |
| MOQ: | 1T |
| Price: | $460.00/T |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 10000tons/Monthly |
| Delivery Time: | 15-20 days or subject to the clients' requirement and quantity |
| Packaging Details: | Standard Seaworthy Package |
| Standard: | ASTM |
| Product Name: | Steel Rebar |
| Processing Service: | Bending, Welding, Decoiling, Cutting, Punching |
| terms: | FOB EXW CIF |
| Company Info. |
| Shandong Heyixin Metal Materials Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
| Product Name | steel rebars |
| Diameter | 6mm,8mm,10mm, 12mm, 13mm, 14mm, 16mm, 20mm, 22mm, 25mm, 30mm, 32mm |
| Standard | BS4449-2005,GB1449.2-2007,JIS G3112-2004, ASTM A615-A615M-04a |
| Grade | HRB335, HRB400, HRB500, 460B, B500A, B500B, B500C |
| Packing | Bundle, or with all kinds of colors PVC or as your requirements |
| Delivery Term | CFR CIF FOB |
| Processing Service | Bending, Welding, Decoiling, Cutting, Punching |
| Tolerance | ±1% |
| MOQ | 1ton |
| Surface Treatment | 1. Galvanized 2. PVC,Black and color painting 3. Transparent oil,anti-rust oil 4. According to clients requirement |


FAQ:
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after
receiving deposit or receiving L/C; for products need new
production for common materials, usually make shipments in 15-20
days; for products need new production for special and rare
materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or
processing, will provide the Original Mill Test Certificate
certified to EN10204 3.1; for the stock products and the products
need cutting or furthur processing, will issue Certificate of
Quality on our Company, It will show the original mill name and the
original datas.
3. Once the received products found not comply with the products
the contract demands, what will you do?
Once the received products found not comply with the products the
contract lists, when receiving the pictures and the official
documents and data from your side, if it is proved not comply, we
will compensate the loss at first time.
China Supplier steel structure large span building 12mm reinforced deformed tmt steel bar
|