Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Pumps >

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction

Categories Steel Structure Building
Brand Name: TSIN
Model Number: TSIN
Certification: ISO, CE, SGS
Place of Origin: Shandong, China
Place Of Origin: Qingdao, Shandong, China
MOQ: 1000 sqm
Price: USD 40-60 / sqm
Payment Terms: T/T,L/C
Supply Ability: 100,000 sqm / month
Delivery Time: 6 weeks after shop drawing get approval
Packaging Details: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Warranty: 5 Years
Maintenance Costs: Reduced
Labor Costs: Lower
Connection: Bolts
Insulation: EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel: 50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life: 50 Years
Product: Steel Structure
Material Grade: Q355B, Q235B
Structure type: Portal frame
Design Load: Wind, Snow, Seismic
Design software: PKPM, Tekla structures, CAD
Sand blasting: Sa 2.5
Surface treatment: Anti-corrosive paint or hot dipped galvanized
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction
Product Description
Modern Prefabricated Steel Building

The Modern Prefabricated Steel Building is engineered for easy assembly and recyclability, making it perfect for industrial warehouses, offices, and residential projects. Utilizing high-quality steel, it forms a robust load-bearing framework, known as the main frame, consisting of beams and columns.

Structural Components

The building features a comprehensive bracing system, which includes:

  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing

These components work in harmony with precision-engineered roof, wall, and floor systems to create a durable and stable metal structure.

Advantages Over Traditional Concrete Buildings
  • Enhanced Strength : Steel plates or sectional steel replace reinforced concrete, providing superior structural strength and improved seismic resistance.
  • Faster Construction : Prefabricated components are manufactured in factories and can be quickly assembled on-site, significantly reducing the construction period.
  • Sustainability : Steel is reusable and recyclable, contributing to reduced construction waste and promoting environmental responsibility.

This modern prefabricated steel building offers a versatile, efficient, and eco-friendly solution that seamlessly combines strength, speed, and sustainability.

Prefabricated steel structure building Steel structure building interior Steel structure building exterior
PRODUCT SPECIFICATIONS
ProductsSteel Structure Warehouse
Frame typePortal frame, multi-story frame
Main frameHot-rolled or Welded H beam and column, Q355B steel
Bracing componentsTie bar, staying bar, Horizontal bracing, Column bracing
Cladding systemSandwich panel with glass wool, rock wool,PU insulation,Corrug ated color steel sheet
AccessoryRidge tile, trim, Gutter, Down pipe,skylight, clerestory
DoorRoll up door, industrial section door, swing door, Sliding door
WindowPVC window, aluminum window, metal louver
Steel structure warehouse Steel structure construction
Our Advantages
Advantages of Steel Structure Buildings
  1. Easy to Assemble
    Prefabricated steel components are installed on-site according to drawings. The assembly sequence includes:
    • Steel columns with cross-bracing
    • Roof beams and horizontal bracing
    • Purlins and enclosures
  2. Cost-Effectiveness
    The lightweight nature of steel reduces foundation expenses, while rapid construction allows for earlier operation. Overall economic benefits surpass those of traditional concrete buildings.
  3. Simplified Construction with Short Timelines
    Factory-manufactured components are assembled on-site, drastically shortening build time. A 4,000㎡ steel structure can be installed in approximately 40 days.
  4. Energy-Efficient & Eco-Friendly
    Corrugated color steel sheets and sandwich panels offer energy-saving properties. Dry construction minimizes dust and pollution, while steel's recyclability further reduces environmental impact.
Design Key Factors
  1. Optimal Column Spacing
    Using H-section steel for columns and beams, column spacing (typically set at 6.8-9m) directly influences steel usage and costs. Building height should meet functional requirements for equipment and maintenance access.
  2. Proper Lighting & Ventilation
    Large-span interiors require energy-efficient designs. For taller buildings, operable ground-floor windows serve as primary air inlets, complemented by roof ventilators for effective lighting and ventilation.
Differences vs. Concrete Buildings
  1. Shorter Construction Period
    Minimal on-site welding in prefabricated components makes steel structure construction significantly faster than concrete builds.
  2. More Eco-Friendly
    Steel components are hoisted and spliced without water, reducing dust and pollution in surrounding areas.
  3. Better Cost Performance
    Faster construction reduces labor costs, with total expenses approximately 20-30% lower than traditional concrete buildings. Steel also offers greater durability.
  4. Lighter Structure
    Lightweight metal walls and roofs significantly reduce overall weight, easing foundation loads compared to brick-concrete alternatives.
Quality inspection process Quality certification
FAQ
  1. What materials are used in your steel structure buildings?
    Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.
  2. What certifications do your steel structure buildings have?
    Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.
  3. How long is the construction period of a steel structure building?
    The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.
  4. Can steel structure buildings be customized according to needs?
    Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.
  5. Do you provide installation guidance for steel structure buildings?
    We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.
Buy Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction at wholesale prices
Send your message to this supplier
 
*From:
*To: Qingdao Tsin Steel Structure Construction Technology Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0