Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Boiler Parts >

SA210A1 Boiler Economizer for Waste Incinerator ASME Standard

Categories Boiler Economizer
Certification: ASME, ISO, EN
Place of Origin: China
MOQ: 10 Tons
Payment Terms: L/C,T/T
Supply Ability: 9000 tons per year
Delivery Time: 50-150 days
Packaging Details: steel frame
Product Name: Boiler Economizer
Application: Waster Incinerator
Material of Base Tube: SA210A1
Tube Dimension: OD50.8mm*5.17mm MWT
Production Technique: Tube Bending
Fabrication Standard: ASME
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

SA210A1 Boiler Economizer for Waste Incinerator ASME Standard

Boiler Economizer SA210A1 with handcuffs and tube shields for waste incinerator


Product Introdution


Economizer is a device installed at the lower part of the tail flue of a boiler to recover the waste heat from the exhaust gas. It heats the boiler feedwater into a saturated water heating surface under the pressure of the steam drum. Due to its absorption of heat from high-temperature flue gas, it reduces the exhaust temperature of the flue gas, saves energy, and improves efficiency. Therefore, it is called an economizer.
The steel tube economizer is not limited by pressure and can be used as a boiling type. It is generally made of carbon steel pipes with an outer diameter of 32-51 millimeters. Sometimes fins and ribs are added to the tube to improve heat transfer efficiency. The steel tube economizer consists of horizontally arranged parallel elbow pipes (commonly known as serpentine pipes).
Economizers are mainly suitable for industry and are gradually becoming popular in agriculture and some related industries.



Parameters of Boiler Economizer

DescriptionBoiler Economizer Coils
MaterialSA210A1 and SA36
Material standardASME
DimensionCustomization
Weight

Min: 10 ton

Max.:1000 ton



ProcessMaterial→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames



Working Process of Boiler Economizer


There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).


Company Profile


The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

Buy SA210A1 Boiler Economizer for Waste Incinerator ASME Standard at wholesale prices
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0