| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Temporary Security Fence |
|---|---|
| Brand Name: | LJ |
| Model Number: | LJ-05 |
| Certification: | ISO9001 |
| Place of Origin: | Hebei Province,China |
| MOQ: | 50 sets |
| Price: | $15-19.6 / Set |
| Payment Terms: | T/T,L/C |
| Supply Ability: | 5000 pcs / 7days |
| Delivery Time: | 7-15 work day |
| Packaging Details: | By pallet or as demand |
| Material: | Hot-dip galvanized tubular frame+welded mesh panels; HDPE stackable ballast blocks |
| Panel Size: | Standard 2400 × 2000 mm (custom sizes available) |
| Mesh: | 50×100 / 50×150 / 75×75 mm options |
| Ballast: | Stackable water-fill blocks (~20–50 L each) or steel ballast boxes for hardstands. |
| Connection: | Quick-fit clamps + pre-drilled posts; optional anti-tilt strut |
| Rental Fleet Features: | Palletizable panels, numbered ID tags, spare clamp kits, rapid-turn procedures |
| Packing & Lead Time: | Ballast nested on pallets; samples 7–10 days; bulk 2–5 weeks |
| Sustainability: | HDPE ballast recyclable; empty blocks reduce transport mass and emissions |
| Company Info. |
| Hebei Luojie Metal Products Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Stackable Water-Ballast Temporary Security Fence Depot-Friendly Rapid-Deploy
Product Overview
The Stackable Water-Ballast Temporary Security Fence pairs welded
mesh panels on a hot-dip galvanised tubular frame with interlocking
HDPE ballast blocks that are filled on site. This configuration
minimizes transported mass and depot footprint — empty ballast
nests tightly on pallets and crews fill with water (or sand) at
deployment, then drain and re-stack for return logistics. Many
leading temporary-fence systems now favour water-fill stackable
blocks for depot efficiency and recyclability.
Rapid deployment & depot efficiency
Panels and ballast ship palletized; pre-drilled posts and quick-fit
clamps let two-person crews erect or dismantle long runs quickly.
Because ballast blocks are lightweight when empty, single operators
can handle them; filled on site they provide required mass for
stability. Rental operators report significantly faster turnover
and lower shipping cost using stackable water ballast versus
concrete units.
Safety, stability & wind guidance
Use low-profile ballast placement and optional anti-tilt struts to
reduce trip hazards while meeting wind-load requirements. For
exposed sites, select heavier steel ballast boxes or increase block
stack height and reduce panel spacing; daily clamp inspection and
triple-point coupling in high-wind zones are recommended best
practices.
Applications & accessories
Suited for concerts, festivals, construction hoardings, emergency
cordons and temporary works yards. Integrate gates, crowd-control
modules, signage clips, anti-lift brackets and CCTV mounts as
needed. Standardized numbered tags and spare clamp kits speed fault
response and reduce on-site downtime for rental fleets.
Operational notes & sustainability
Provide operators with ballast fill volumes, stacking limits and
wind-spacing tables in the job pack. HDPE blocks are recyclable
and, by shipping empty, reduce CO₂ per deployment — a measurable
logistic saving for fleets that turnover frequently. Routine
maintenance: check clamp torque, ballast plugs, and coating
integrity after each rental cycle.
Specification Table
| Attribute | Typical / Notes |
|---|---|
| Panel Size | 2400 × 2000 mm (std) |
| Mesh | 50×100 / 50×150 / 75×75 mm |
| Frame | HDG tubular steel |
| Ballast Block | HDPE stackable, 20–50 L per block (typical) |
| Installation | Quick-fit clamps; anti-tilt optional |
| Pallet Loading | Panels + nested ballast per pallet (varies by height) |
| Sample Lead Time | 7–10 days |




|