| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Industrial Steel Structure |
|---|---|
| Brand Name: | CHINA CLASSIC GROUP |
| Model Number: | JD-GJG104 |
| Certification: | CE-EN1090(EXC4), GB(Highest Level), CIDB |
| Place of Origin: | JINING CITY, SHANDONG |
| MOQ: | 2365 Square Meters |
| Price: | $38-49 Square Meters |
| Payment Terms: | MoneyGram,Western Union,T/T,D/P,D/A |
| Supply Ability: | 527900 Tons/Year |
| Delivery Time: | 38-41 Days |
| Packaging Details: | Packing Strictly According to Customer Requirement |
| Building Type: | Industrial warehouse steel frame |
| Service Life: | 50-70 years(Design Requirements) |
| Raw Material Standard: | drawing design(Q235B, Q355B, Q420B, Q460B, etc.) |
| Processing Service: | Bending, Welding, Decoiling, Cutting, Punching, Spray Painting |
| Exterior Wall Panel: | ALC, Color steel plate. |
| Galvanization: | According to Design Requirement |
| Construction Service: | Engineer Guidance Installation |
| Annual Production Capacity: | 527900 Tons |
| Third-party Inspectionion: | CNAS, TUV(Execute customer requirements) |
| Fire resistance: | Fireproof coating |
| Company Info. |
| Classic Heavy Industry Group Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Durable Galvanized Steel Structure Industrial Building For Workshop Hangar Warehouse.
Steel structure industrial building streamline labor and logistics processes, cutting down on on-site complexity and supply chain delays for industrial construction projects.
Since most steel components are pre-cut, pre-drilled, and pre-assembled in factories, on-site labor requirements are significantly reduced—there is no need for on-site welding teams or concrete curing crews, which minimizes reliance on specialized labor and shortens the project timeline.
The standardized, modular nature of steel parts also simplifies logistics: components are lightweight relative to their strength, reducing transportation costs and enabling delivery in pre-planned batches that align with on-site assembly schedules.
Additionally, prefabricated steel components can be stored on-site temporarily without the risk of degradation, unlike concrete or wood that may be damaged by exposure to the elements. This efficiency in labor and logistics translates to lower project overheads and fewer scheduling bottlenecks, making steel a practical choice for fast-track industrial construction.

|