| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Liquid Painting Line |
|---|---|
| Certification: | CE, ISO |
| Brand Name: | CHG |
| Model Number: | AC-15 |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | 100,000-300,000 USD |
| Payment Terms: | MoneyGram,Western Union,T/T,D/P,D/A,L/C |
| Supply Ability: | 10/Year |
| Delivery Time: | Varies depending on the design |
| Packaging Details: | Varies depending on the design |
| Substrate: | Titanium Alloy Forgings |
| Application: | Hardware Spraying Equipment |
| Size: | Customized |
| HS Code: | 8424899990 |
| Customization: | Available |
| Warranty: | 1 Year, 1 Year |
| Company Info. |
| CHG International Limited |
| Verified Supplier |
| View Contact Details |
| Product List |
Before the forging operation, each workpiece must be uniformly
covered with a glass-based lubricant.
A complete and defect-free coating layer is essential to ensure
stable performance during subsequent deformation and forming
processes.
The applied lubricant forms a robust protective barrier that prevents scaling and oxidation during pre-heating and forging.
Significantly lowers friction at the die–workpiece interface, improving metal flow characteristics.
Reduces tooling wear and extends die service life.
Provides long-lasting lubricity throughout the full deformation cycle.
The lubricant layer must be applied prior to heating and must retain strong adhesion and chemical stability during forging.
Precision spraying or coating mechanisms distribute the lubricant evenly, ensuring reliable coverage even on parts with irregular shapes or complex geometries.
High resistance to thermal degradation at forging temperatures.
Stable coating behavior under combined thermal and mechanical loads.
Maintains film integrity to ensure consistent protection throughout processing.
Each wet-coating system we supply is specially engineered to match
the customer’s materials, product geometry, and production
workflow.
To prepare an accurate technical proposal and quotation, we kindly
request that you provide the key process parameters and production
capacity requirements of your intended coating line.
Please contact us with your application details.
A thorough technical exchange will allow us to design the most
efficient and cost-effective solution for your forging lubricant
coating process.

|