| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Stainless Steel Gas Stove |
|---|---|
| Brand Name: | ECOBRIDGE |
| Model Number: | ECO-GS6073B |
| Certification: | Standard |
| Place of Origin: | Zhejiang |
| MOQ: | 1-100pcs |
| Price: | US$13.9/pcs |
| Payment Terms: | T/T,Western Union,MoneyGram |
| Supply Ability: | 3000pcs/month |
| Delivery Time: | 4-5 work days |
| Packaging Details: | 3-ply color box, 5-ply master carton |
| Color: | Black |
| Carton: | 650*480*370mm,4pcs/CTN,13.5kg |
| Gas Type: | LPG |
| Number Of Burners: | Three burner |
| Burner: | Punching Aluminum Seat,Enamel Fire Cap, 4.5*4.5mm IEF Iron Frame |
| Panel: | 0.45mm Plastic Coating Iron |
| Control Type: | New PP with stainless steel |
| Gift Box: | 533*100*345mm,13.5kg |
| Company Info. |
| ECOBRIDGE COMPANY LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
| Model: | ECO-GS6073B | Color | Black |
| Burner: | Punching Aluminum Seat,Enamel Fire Cap, 4.5*4.5mm IEF Iron Frame | Outer Plate | 0.45mm Plastic Coating Iron |
| Knob: | New PP with stainless steel | Safety Valve: | Aluminum - D0.7mm*2 |
| Tracheal: | D16*0.7mm | Air Hose: | D16mm*1.0 |
| Gift Box: | 635*110*350mm,11.1kg | Carton: | 650*480*370mm,4pcs/CTN,13.5kg |
✔ Ready to ship
✔ Monthly supply capacity:3000pcs
✔ Total 4 warehousestotal, covering an area of 20,000m²

✔Durable Heated Lid
✔Oil Resistant Coating, Easy to clean

✔Energy eficientinternal rotary fire
✔No Need To Cut HolesReady to use

✔Non-slip base
✔Air valve interfacee

✔2.2KW*2 +*1.1KW Fast Heating
✔High Quality Copper Fire Cover
✔Suitable For All Pots And Pans
✔Multi-Position Fire Adjustment
✔Easy to lake care of
✔Compact Body Easy To Carry

✔Aluminum panCasserole
✔Casserole
✔Ceramic pot
✔Enamel pot

✔Glass pot
✔Stainless steel
✔Tin foil
✔Medical stone

✔ Packing: 3- lay color boxes with 5- lay master carton
✔ Delivery Time: Freight forwarder within 3 days; direct overseas: ~1 week

1. Daily Cleaning
After each use, wipe the stove surface with a damp cloth. Once a
week, remove burner caps and pot stands; soak them in warm, soapy
water to clean, then dry before reinstalling.
2. Regular Inspection
Monthly, check if the flame is blue (yellow flames mean cleaning is
needed) and if ignition works smoothly.
3. Safety Check
Every 6 months, apply soapy water to gas connections to check for
leaks (bubbles = leak). Also, inspect hoses for cracks and replace
yearly if needed.

|