| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Heat Exchanger Tubes |
|---|---|
| Brand Name: | TORICH |
| Model Number: | Helical Finned Tube |
| Certification: | API,CE,ISO,ISO9001-2008,ISO9001 |
| Place of Origin: | Zhejiang/CHina |
| MOQ: | 1Ton |
| Price: | 800-1000 USD/Ton |
| Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| Supply Ability: | 60000 Ton/Tons per Year |
| Delivery Time: | 20-30days upon products |
| Packaging Details: | In bundles or in wooden boxes. |
| Application: | Boiler Economizer |
| Standard: | ASTM,DIN,GB,JIS,API |
| Thickness: | 2 - 100 mm, |
| Technique: | Cold Drawn,Hot Rolled,Cold Rolled, |
| Grade: | 09CrCusb GB 20G SA210 T11 T12 |
| Alloy or not: | Non-alloy,Is Alloy,NON -alloy |
| Standard2: | ASTM A53-2007,DIN 2391,API 5L,ASTM A106-2006,DIN 17175 |
| Section shape: | Round,Rectangular |
| Outer diameter(round): | 30 - 325 mm |
| Special pipe: | Thick Wall Pipe,API Pipe,Precision steel tube,precision seamless pipe,cold drawn |
| Secondary or not: | Non-secondary |
| Length: | 6M or as requirement,As customer's require |
| Material: | steel,BR1500HS,ect,ss304,Gr.B |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |

Material
A high-frequency resistance welded helical/spiral finned tube
produced with an ND steel (09CrCuSb) base tube and optional
ND/carbon/stainless fin strip. ND steel is a Cu–Sb–Cr–alloyed
low-alloy steel engineered to resist low-temperature sulfuric-acid
dew-point corrosion and chloride attack in flue-gas paths, making
it ideal for boiler economizers and air preheaters.
Specifications
Tube OD (bare): 19–63.5 mm (3/4"–2-1/2"); other sizes on request
Wall thickness: 2.0–8.0 mm
Fin type: Solid or serrated helical fin, continuous wrap, HFERW bond
Fin material & thickness: ND steel / carbon steel / stainless; 0.8–3.0 mm typical
Fin height: 8–20 mm (±1.0 mm after welding)
Fin pitch (fins per meter): as specified; tolerance +5%/−2%
Tube straightness (finished finned tube): max deviation 5 mm per 3 m (scaled for shorter lengths)
Ends: Plain or beveled; specified bare ends length tolerance ±6 mm or one fin spacing, whichever is greater
Typical base-tube alternatives: SA210 A-1 / GB 20G (carbon), A213 T11/T12 (Cr-Mo), EN 10216-2 P235GH / 16Mo3.
Key Features
High corrosion resistance at dew point
Efficient, durable fin-to-tube bond (HFERW)
Geometric consistency for performance
Material traceability to ordered standards
Our Advantages
Straightness & fit-up — ≤5 mm/3 m finished tube; ≤3 mm/3 m bare tubes
Dimensional tolerances — Bare OD ≤±1.0 mm; fin height ±1.0 mm; fin pitch +5%/−2%
Weld integrity — Min weld width ≈90% of fin thickness or ≥170 MPa weld tensile; controlled weld interruptions; no PWHT required
Right material for flue gas — ND steel specifically targets acid dew-point service in economizers
Standards-based alternatives — SA210 A-1 / GB 20G; A213 T11/T12; EN P235GH
Chemical Composition (wt.%)
09CrCuSb (ND steel): C ~0.09; Cr 0.30–0.60; Cu 0.20–0.40; Sb 0.05–0.10
GB 20G: C 0.17–0.23; Si 0.17–0.37; Mn 0.35–0.65; P ≤0.025; S ≤0.015–0.020; residual Cr ≤0.25; Cu ≤0.20
SA210 A-1: C ≤0.27; Si ≤0.10; Mn ≤0.93 (adjustable with C); P ≤0.035; S ≤0.035
A213 T11: C ≤0.15; Si 0.50–1.00; Mn 0.30–0.60; P ≤0.025; S ≤0.025; Cr 1.00–1.50; Mo 0.44–0.65
A213 T12: C ≤0.15; Si 0.50–1.00; Mn 0.30–0.60; P/S ≤0.025 (T12S option S ≤0.045); Cr 1.00–1.50; Mo 0.44–0.65
Mechanical Properties
SA210 A-1: Tensile ≥415 MPa; Yield ≥255 MPa; Elongation ≥30%
A213 T11/T12: Tensile ≥415 MPa; Yield ≥205 MPa; elongation per A213 table (size dependent)
GB 20G: Typical plate/tube levels ~Tensile 410–500 MPa; Yield ≥235 MPa; Elongation ≥24% (verify on MTC)
09CrCuSb: Supplier-qualified per order; certified on MTC
Execution Standards
ASTM/ASME: A213/SA213 (T11, T12), A210/SA210 (A-1)
EN: EN 10216-2 (P235GH, 16Mo3)
JIS: G3461 (carbon), G3462 (alloy)
GOST: 8731/8732 (seamless), 8734 (precision cold-formed)
Fin-weld reference: International HFERW fin dimensions/tolerances/tests
Application Fields
Power-plant economizers, air preheaters, waste-heat recovery,
flue-gas condensers, and industrial heat exchangers in
SOx/Cl−-bearing service.








A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-40 days if the goods are not in stock,
it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
|