ANCO 90D-30L All Electric Blow Moulding Machine
ANCO 90D-30L 4-5 Gallon 20L HDPE Jerry Can With Engine & Motor
Automatic Blow Molding Energy Saving Long Service Life
Technical Specifications
| Specification | Value |
|---|
| Voltage | 380V |
| Clamping Force (kN) | 180 |
| Output (kg/h) | 40 |
| Plastic Processed | PP, HDPE, PET, PE/PP, HDPE/PP |
| Automation | Automatic |
| Power (kW) | 35 |
| Weight (t) | 1.5 |
| Warranty | 1 Year |
| Core Components | PLC, Engine, Bearing, Motor |
| PLC Brand | MITSUBISHI |
| Screw L/D Ratio | 75 |
| Screw Diameter (mm) | 75 |
| No. of Screw Heating Zone | 5 |
| Screw Heating Power (kW) | 9 |
| Extruder Motor Power (kW) | 7.5 |
| Mold Platen Size Width (mm) | 120 |
| Mold Platen Size Height (mm) | 250 |
| Air Pressure (MPa) | 0.8 |
| Air Consumption (m³/min) | 0.6 |
| Die Head Heating Power (kW) | 17 |
| Dimension (L×W×H) | 3400 × 1600 × 1800 |
Key Features
- Long Service Life
- Easy to Operate
- Energy Saving Design
- Automatic Operation
- High Efficiency Output
Manufacturer Information
Zhangjiagang Anco Machinery Equipment Co., Ltd. was established in
2008, headquartered in Zhangjiagang City, Suzhou City, Jiangsu
Province. We are an enterprise that integrates research and
development, production, sales, and service, deeply involved in the
field of plastic molding equipment.
We are committed to providing efficient, energy-saving, and
intelligent extrusion blow molding machines to global customers,
helping them achieve dual improvements in production efficiency and
product quality. Our modular design supports rapid mold change and
flexible production, meeting diverse customer needs.
Strict quality control and full process digital testing ensure
equipment stability and industry-leading lifespan. We provide
24-hour response, technical training, and spare parts supply. Our
products are exported to foreign markets, and we provide process
optimization and equipment upgrade solutions based on customer
production needs.
Frequently Asked Questions
Can your machine meet our specific needs?
Yes, we will supply you with a customized proposal based on your
specific requirements. Each machine is tailored to satisfy customer
needs effectively.
How long does it take before my machine shipment?
Usually takes about 30-40 days after confirmation. We also have
some machines in stock that could be ready for shipment within 7
days.
What would you offer before I arrange balance payment?
After the machine is ready, we send machine photos and videos for
your review. If you have a mold, we test it and send samples.
You're welcome to visit our factory or send a third-party
inspection organization.
What's your guarantee or warranty for the quality?
We offer high quality machines with 1-year guarantee and supply
life-long technical support.
How can I install my machine when it arrives?
We will send our engineers to your factory to install the machines
and train your staff on proper operation.