| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Transformer Test Bench |
|---|---|
| Brand Name: | Or-electric |
| Certification: | ISO9001,ISO14001,ISO45001 |
| Place of Origin: | Wuhan,China |
| Model Number: | ORTOS-35kV |
| MOQ: | 1 set |
| Price: | 45000~245000 USD/set |
| Payment Terms: | D/P,T/T,Western Union,MoneyGram |
| Supply Ability: | 200 sets/year |
| Delivery Time: | 60 work days |
| Packaging Details: | Wooden Box |
| Stanadard: | GB 50150/IEC 60076-3 |
| Structure: | Split-type/Integrated |
| Wiring mode: | Manual/Automatic |
| Control mode: | Manual/PLC+Computer |
| Communication: | RS232/RS485/Ethernet/USB |
| Frequency: | 50Hz/60Hz |
| Max test object voltage: | 35kV |
| Max test object capacity: | 25000kVA |
| Warranty: | 1 Year |
| HS code: | 9030390000 |
| Company Info. |
| Wuhan Ourui Electric Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
ORTOS-35kV Transformer/Reactor Integrated Test System (One-body)
I. Product introduction
35kV transformer/reactor integrated test system (one-body) is designed in strict accordance with relevant standards such as GB 50150/IEC 60076-3. It adopts a box structure with a small size and low space occupancy. It can perform DC resistance test, no-load test, load test, induced voltage withstand test, temperature rise test, etc. It is simple to operate and easy to install and debug. There is no need for on-site guidance from engineers. The operator can connect the power cord and test line to complete all tests on the control box.
II. Electric tests (customizable)
● DC resistance test
● No-load test
● Load test
● Induced voltage withstand test
● Temperature rise test
III.Configuration list (customizable)
Equipment name | QTY (set) | Note | |
Test system control box | Control box | 1 | Include power input control, variable-frequency power output control,step-up test transformer control,transformer installation and range adjustment control, capacitor installation and group switching control, etc., using well-known brand components |
Industrial computer & accessories | 1 | Advantech industrial computer/19-inch embedded display/EAST rack-mount UPS/isolation transformer. | |
Test software system | 1 | Written in Visual Studio, dedicated to comprehensive test control and measurement | |
PLC control system | 1 | Siemens PLC, used for comprehensive testing of electrical equipment control | |
Power analyzer | 1 | 4U chassis | |
Variable-frequency power supply | 1 | 45Hz~300Hz, adjustable | |
LV capacitor bank | 1 | 3-phase | |
Step-up test transformer | 1 | Electric switching | |
HV capacitor bank | 1 | 1-phase | |
Current transformer | 3 | Dry-type, 0.05 class | |
Voltage transformer | 3 | Dry-type, 0.05 class | |
DC resistance test | 1 | 4U chassis, Dual-channel | |
Temperature inspection instrument | 1 | >16->channel, include 16 temperature detection wires (5 m/pc), TP100 probe | |
IV. Warranty period & after-sale service
● The warranty period for the products supplied by the supplier is
12 months from the date of product acceptance or 15 months from the
date of the last piece of equipment arrival, whichever comes first.
Within the warranty period, the supplier shall provide free
services to the purchaser; After the warranty period, the supplier
will only charge a cost fee for the expenses incurred in repairing
the equipment.
● All products come with lifetime maintenance services.
V. Company profile

|