| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Concrete Tunnel Formwork |
|---|---|
| MOQ: | 100 PCS |
| Payment Terms: | T/T in advance |
| Place of Origin: | Chengdu , China |
| Brand Name: | Shunyao Supply Chain |
| Packaging Details: | Bundles |
| Delivery Time: | 5-15 days |
| Supply Ability: | Excellent |
| Formwork type: | Tunnel |
| Installation time: | Reduced installation time compared to traditional formwork |
| Assembly method: | Modular and easy to assemble/disassemble |
| Product name: | Concrete Tunnel Formwork |
| Reusability: | Reusable multiple times |
| Weight: | Varies depending on size and material |
| Load capacity: | High load-bearing capacity |
| Company Info. |
| Sichuan Shunyao Supply Chain Management Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
The full name of this product is Tunnel Steel Formwork, with common other names including Tunnel Lining Steel Formwork, Tunnel Concrete Steel Mould, Trolley-Matched Steel Formwork, and Assembled Tunnel Steel Formwork. The core keywords cover Tunnel Steel Mould, Lining Steel Formwork, Custom Steel Formwork, Tunnel Construction Steel Formwork, and High-Strength Tunnel Formwork. Widely applicable to scenarios such as overseas project bidding, cross-border e-commerce display, international exhibition promotion, and technical cooperation negotiations, it is a core forming equipment for various tunnel constructions.
Compared with similar products, this tunnel steel formwork has five core advantages: first, cost controllable, reusable for 50-120 times, the turnover efficiency is 8-10 times that of wooden formwork, significantly reducing long-term use costs; second, environmental protection and energy saving, the full steel material can be 100% recycled, no wood waste, complying with global green building standards; third, high construction efficiency, modular assembly and disassembly combined with trolley use, the single-cycle pouring time is shortened to 8-12 hours, far lower than the 16-24 hours of traditional formwork; fourth, stable quality, completely avoiding problems such as easy deformation and slurry leakage of wooden formwork, and the lining qualification rate is increased to over 99%; fifth, convenient after-sales, damaged parts can be replaced individually without overall scrapping, greatly reducing maintenance costs.
| Material | Steel | Brand Name | Shunyao supply chain steel frame | |
| Feature | High Strength, Easily Assembled, Reusable | Warranty | 2 Years | |
| Design Style | Traditional | After-sale Service | Online Technical Support, Onsite Installation | |
| Project Solution Capability | 3D model design, graphic design | Place of Origin | Chengdu, China | |
| Function | Construction Concrete Support | Surface treatment | Printed | |





|