| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Construction Formwork Accessories |
|---|---|
| Brand Name: | WKS |
| Certification: | ROHS |
| Place of Origin: | Hebei,China |
| MOQ: | 200 Piece |
| Price: | US $1.00 - 2.00/ Piece |
| Payment Terms: | T/T |
| Supply Ability: | 1000 piece in 10 days |
| Delivery Time: | 10-30 workday |
| Packaging Details: | Bundled / Tied in bundles/Optimization of container loading |
| Product name: | Construction Formwork Accessories |
| Size: | 500*2000mm, 1000*2000mm etc |
| Tube Length: | 750mm 720mm 800mm 900mm 1200mm |
| Width: | 800mm |
| Pitch: | 10mm |
| Standardcompliance: | Meets ASTM and EN Standards |
| Sample: | Available |
| Reusability: | Reusable Multiple Times |
| Load Capacity: | 3500LBS |
| Weight: | Lightweight to Heavy Duty Options |
| Color: | Typically Silver / Black / Custom Colors Available |
| Company Info. |
| WORKSUN GROUP CO., LTD. |
| Verified Supplier |
| View Contact Details |
| Product List |
Formwork Accessories are the critical hardware components—including tie rods, clamps, bolts, and anchors—that secure concrete formwork systems. They ensure structural integrity during pouring by resisting lateral pressure, preventing formwork deformation, and guaranteeing precise dimensional accuracy in walls, columns, and slabs.
Our accessories provide full compatibility with major formwork brands, ensuring seamless integration. With rigorous quality control and a complete product range, we deliver the reliability needed for high-rise, bridge, and infrastructure projects, minimizing downtime and ensuring on-schedule completion.
| Product | Specifications & Features | Function |
|---|---|---|
Wedge & Pin |
| Fastening device used to securely link all aluminum alloy panels together. |
Tie-Rod |
| Connecting device for firmly linking wall panels in various formwork systems. |
Wing Nut & Anchor Nut |
| Used with tie rods to securely link wall and column panels in formwork systems. |
Adjustable Column Formwork Clamp |
| Used in column formwork systems to secure panels and prevent deviation. |
Formwork Clamp |
| Used in steel frame formwork systems to link and secure wall panels tightly. |
Rapid Formwork Clamp |
| Used in steel frame formwork systems for quick linking and securing of wall panels. |
Adjustable Steel Prop |
| Supports slab panels and adjusts them to the same horizontal plane in slab formwork systems. |
Push-Pull Prop |
| Supports wall panels and ensures proper alignment in formwork systems. |
Flat Wall Tie |
| Links wall panels and ensures accurate positioning in aluminum alloy formwork systems. |
Steel Prop Fork-Head |
| Supports H20 timber beams in H20 timber beam formwork systems. |
Prop Nut |
| Adjusts steel props in formwork support systems. |
We are a subsidiary foreign trade company of a group company, responsible for exporting formwork and scaffolding products. Our group has two production bases with over 32 years of manufacturing experience.
We provide professional implementation solutions, high-quality products, and efficient technical support services in formwork and scaffolding.
Yes, we provide samples. Customers are responsible for shipping costs.
We require architectural and structural drawings of the project.
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop application plans based on your drawings.
Typically 5-8 days to complete specific plans and detailed quotations.
Usually 30-60 days for stocking completion, depending on project complexity.
T/T 30% deposit before manufacture, 70% balance against B/L Copy, or L/C.

|