Schedule 80 Carbon Steel Pipe Tee Buttweld Alloy Steel Fittings Astm A234
|
Carbon Steel Tees Schedule 80 Tee Buttweld Alloy Steel Pipe Fittings ASME A234 Black Carbon Steel Tees could be a most common sort of CS fitting utilized to connect pipe or tubing to permit a alter of direction, more often than not a 90° or 45° angle, though 22.5 Degree Elbow Carbon Steel is additionally utilized in a piping framework. All beat manufacturers utilize Carbon Steel Elbow Cold Shaping Machine in China . ASTM A105 Carbon Steel......
Hebei Yisheng Piping Co., Ltd.
|
Schedule 40 Carbon Steel Pipe Tee Butt Weld Asme B16.28
|
...Carbon Steel Pipe Tee ASME B16.28 Ex-Factory In Stock Tee Product Description: Material: Carbon Steel: ASTM/ASME A234 WPB/WPC; A420 WPL6; ASTM A860 WPHY42/52 /60/65/70/75, ST37.0, ST35.8, ST45.8, 10CRMo910, 15CrMo, 12Cr1MoV,etc; Alloy Steel: A234 WP1/WP2/WP5/WP9/WP11/WP12/WP22/WP91, etc; Stainless Steel......
Cangzhou Xingkui Pipeline Equipment Co.,Ltd
|
astm A105 schedule 80 carbon steel pipe
|
astm A105 schedule 80 carbon steel pipe 1.Material: Q235.A105.20#. a139 gr.b 2.Technics: Cold Drawn 3.Type: Seamless 4.Place of Origin: Cangzhou, China (Mainland) 5.Standard: ASTM,DIN, JIS, BS, GB,API 6.Certs: ISO 9001 2008, CE, TUV 7.Delivery Time:20days-......
Hebei Lufeng Piping Equipment Co., Ltd.
|
ASTM A106 Grade B' Schedule 80 Carbon Steel Pipe For Shipbuilding / Petrochemical
|
Carbon Steel Welded Pipes ASTM A106 Grade B Sch80,carbon steel pipes, Sch40,carbon steel pipes,Galve Pipe,ASTM B36.10 ERW Line Pipe Standard: API 5L Steel Grade: GR.A, Gr. B, X42, X46, X52,X56,X56,X60,X70 ERW Galvanized Steel pipe Standard: ASTM A53, ......
TOBO STEEL GROUP CHINA
|
Seamless schedule 40 carbon steel pipe ASTM A53 with API 5L for oil and gas line
|
... tube&pipes with O.D from 1/2''-12''.The hot expandation line can produce the pipes with O.D from 14''-48''.The pipes have secured such important international certificates as API5L,API5CT,BV,CE-PED,and NIOEC,Certificate of special equipment production.The...
SHANGHAI HAIJI IMPORT&EXPORT CO.,LTD
|
Schedule 40 Carbon Steel Pipe Fittings Concentric Reducer
|
Schedule 40 Carbon Steel Pipe Fittings Concentric Reducer Schedule 40 refers to a specific wall thickness designation for carbon steel pipes. When combined with carbon steel pipe fittings, such as a concentric reducer, it indicates the thickness of the fittings that are compatible with Schedule 40 pipes. A carbon steel pipe fittings concentric reducer designed for Schedule 40 pipes would have the following characteristics: Material: Carbon...
Hebei Shengtian Pipe Fittings Group Co., Ltd.
|
Butt Weld Fittings Sch20 Carbon Steel Pipe Tee ANSI ASME GOST JIS DIN EN
|
... steel tee(SS tee), laterial tee, barred tee, steel saddle tee SIZE:1/2”-72” SURFACE TREATMENT:Shot blasted, black painting, rust-proof oil, transparent oil, galvanizing,, hot galvanizing PRODUCT TYPE equal tee(EQ tee), straight tee, reducing tee,...
Hebei Xinfeng High-pressure Flange and Pipe Fitting Co., Ltd.
|
ASTM A860 WPHY 60 Carbon Steel Pipe Tee , 8 " Sch XS Seamless Steel Pipe Fittings
|
...quantities, the material could be ASTM A860 WPHY60 and size is 8" Sch XS. Carbon steel buttweld tee offers an outlet for pipeline, as a basic pipe fittings, it is large demanded and we also stock a lot. It has advantages of large apply range, strong and...
ZIZI ENGINEERING CO.,LTD
|
40 Schedule Seamless Carbon Steel Pipe
|
...PIPE:200mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE:150mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE:100mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE:80mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE:65mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE:50mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE:40mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE:32mm(40 Schedule Seamless Carbon Steel Pipe) MS PIPE......
Shijiazhuang Bang dong Pipe Trading Co,Ltd.
|
Q215 ASTM A53 GrB Schedule 40 Carbon Steel Pipes Copper Coated
|
ASTM A53 Gr. B ERW schedule 40 carbon steel pipe used for oil and gas pipeline Product Description ASTM A53 Gr. B ERW schedule 40 carbon steel pipe used for oil and gas pipeline The mechanical engineering workshops of our factory are all equipped with ......
Shandong Weiao Metal Products Co., Ltd
|
