| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Column Formwork System |
|---|---|
| Brand Name: | ForPro |
| Model Number: | customized |
| Certification: | ISO and CE |
| Place of Origin: | shanghai |
| MOQ: | 100 Squ |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 1000000 Sqm / year |
| Delivery Time: | 15-20 work days |
| Packaging Details: | Pallet |
| Material: | Q235 Steel, Timber beam,Plywood |
| Color: | Yellow,Blue,Black |
| Size: | customized |
| Features: | Simple and efficient operation |
| Product name: | environmental building column formwork aluminium alloy formwork, steel column formwork, Aluminum Formwork Construction Material, aluminum formwork system concrete forming system concrete formwork, Aluminium Adjustable Column Formwork |
| Application: | Concrete Construction, wall and column concrete construction |
Timber Beam Column and Wall Formwork for Building Construction with High Efficiency
Outline
High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall and column formwork units when a frequent change of the building structure plans happens.

Technical Specification
The steel waling of standard adjustable column formwork has three
specifications. This can satisfy the need of concreting of column
with waling length from 200mm to 1200mm.
| The length of steel waling(mm) | The side length of column(mm) |
| 1500 & 1800 | 800~1200 |
| 1500 & 1200 | 400~800 |
| 1200 & 900 | 200~400 |
Advantages
1. Can create any shape and size of wall and column formwork with
any thickness.
2. Can choose whichever form face material best meets your
requirements - e. G. For smooth fair-faced concrete.
3. Depending on the concrete pressure required, the beams and the
steel waling are spaced closer or apart. This ensures optimum
form-work design and the greatest economy of materials.
4. Can be pre-assembled on your site or before arrival at your
site, saving time, cost and space for you.
5. Can match well with most Euro formwork systems.
Delivery
1. Production: For full container, normally we need 20-30 days
after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Applications

|