| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Column Formwork System |
|---|---|
| Brand Name: | ForPro |
| Model Number: | customized |
| Certification: | ISO and CE |
| Place of Origin: | shanghai |
| MOQ: | 100 Squ |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 1000000 Sqm / year |
| Delivery Time: | 15-20 work days |
| Packaging Details: | Pallet |
| Material: | Q235 SS Steel, Timber beam, Plywood |
| Color: | Yellow,Blue,Red,Orange |
| Column Length: | 800~1200mm |
| Features: | Simple and efficient operation |
| Product name: | Circular column formwork |
| Application: | Concrete Construction, wall and column concrete construction |
Timber Beam Column and Wall Formwork for Building Construction with High Efficiency
Outline
The high flexibility of only a few major components can meet any construction requirements. Wood beam H20, steel wallboard, plywood and fixture, etc... Circular work columns components can be combined into many shapes to meet different needs. When the plan of building structure is frequently changed, wall and column formwork units can also be reorganized.

Technical Specification
The steel waling of standard adjustable column formwork has three
specifications. This can satisfy the need of concreting of column
with waling length from 200mm to 1200mm.
| The length of steel waling(mm) | The side length of column(mm) |
| 1500 & 1800 | 800~1200 |
| 1500 & 1200 | 400~800 |
| 1200 & 900 | 200~400 |
Advantage
1. Wall and column formwork of any shape, size and thickness can be
made.
2. You can choose the surface material that best meets your
requirements, such as smooth fair faced concrete.
3. According to the required concrete pressure, the spacing between
beam and steel wall shall be closer or farther. This ensures the
best template design and maximum material economy.
4. Pre assembly can be carried out on site or before arriving at
the site, saving you time, cost and space.
5. Compatible with most European template systems.
Delivery
1. Production: For full container, normally we need 20-30 days
after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Applications

|