Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Other General Mechanical Components >

2 Inch Choke Kill Manifold Drilling Well Control For Oil Wells

Categories Choke Kill Manifold
Brand Name: Hebei Pantu
Model Number: YG35
Certification: API 16C
Place of Origin: China
MOQ: 1 set
Price: USD 50000-100000 per set
Payment Terms: T/T
Supply Ability: 5 sets per 3 months
Delivery Time: 7 work days
Packaging Details: Iron Case
Name: Choke Manifold And Kill Manifold
Model: YG35
Bore size: 2 9/16"
Pressure: 5000psi
Application: Oil Wells
Standard: API
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

2 Inch Choke Kill Manifold Drilling Well Control For Oil Wells

API Choke Manifold And Kill Manifold 2 9/16" 5000psi


Choke Manifold And Kill Manifold is the necessary equipment to control well kick and implement pressure control technology of oil and gas wells. When the BOP is closed, the choke valve is used to control the casing pressure to maintain the bottom hole pressure slightly greater than the formation pressure and to prevent further formation fluid flow into the well. In addition, choke manifold can be used to relieve pressure to achieve soft shut-in.


Choke Manifold And Kill Manifold Parameter


TypeWorking pressureMain bore diaBy-pass dia.Remarks
(psi)On.)(In.)
YG140200004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 1/16" 2 9/16"Different types of combinations can be provided according to requirements
YG105150004 1/16" 3 1/16" 2 9/16" 2 1/16"3 1/16" 2 9/16" 2 1/16"
YG70100004 1/16" 3 1/16" 2 9/16" 2 1/16"4 1/16" 3 1/16" 2 9/16" 2 1/16"
YG3550004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"
YG2130004 1/16" 3 1/8" 2 9/16" 2 1/16"4 1/16" 3 1/8" 2 9/16" 2 1/16"

Working Principles


When the pressure inside the well rises, opening/closing the choke valves(including manual chokes, hydraulic chokes, and positive chokes)on the choke manifold can allow the release of the fluid inside the well to control casing pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.


Operating Instructions


(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at a place where the operator can reach it easily. The pressure test must be performed before installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120-degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low-temperature conditions.


Buy 2 Inch Choke Kill Manifold Drilling Well Control For Oil Wells at wholesale prices
Send your message to this supplier
 
*From:
*To: Hebei E-valves Petroleum Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0