| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Cast Iron Manhole Cover |
|---|---|
| Brand Name: | SND Foundry |
| Model Number: | SND Manhole Cover |
| Certification: | ISO / CE |
| Place of Origin: | Handan, China |
| MOQ: | 10 tons |
| Price: | $50-90/t |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 20000 tons per year |
| Delivery Time: | 45 days |
| Packaging Details: | wood pallet/ bulk |
| Product Name: | European Standard EN124 Pressure Grade D400 Cast Iron Round Manhole Cover |
| Key Words: | Manhole Cover and Frame |
| Sizes: | 700*700*100mm |
| Class: | D400 |
| Pattern: | As Drawing |
| Paint: | Spray paint, |
| Standard: | EN124 |
| Material: | Ductile Iron |
| Company Info. |
| Handan Shengnada New Material Technology Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
European Standard EN124 Pressure Grade D400 Cast Iron Round Manhole Cover
The installation steps of D400 round cast iron manhole cover (taking municipal road scene as an example) can be operated according to the following process specifications to ensure firm installation, adaptability to the road surface, and bearing performance:
1. Construction preparation
Materials and tools: Prepare D400 round cast iron manhole cover,
manhole ring, C25 and above grade concrete, steel bars (if
necessary), as well as level, vibrator, cutter, wrench and other
tools.
Site survey: Check the size of the wellhead, clean up the
surrounding debris and soil, check the flatness and verticality of
the wellbore, replace the soft foundation with graded gravel +
medium coarse sand in advance and compact it (density ≥95%).
2. Foundation treatment and well frame installation
Well frame positioning: Place the well frame at the wellhead,
ensure that the edge is aligned with the wellhead, level it with a
level (horizontal error ≤2mm), pour C25 concrete (width ≥300mm,
thickness ≥150mm) at the bottom and around the well frame, and
vibrate it to make it dense. If there are anchor steel bars
("U"-shaped / "L"-shaped, diameter ≥12mm threaded steel bars), bury
them in the reserved holes of the manhole frame or fix them
tightly.
Elevation control: According to the elevation of the road surface,
use the "cross method" to measure the positioning points to control
the elevation of the top of the manhole frame, and smoothly connect
with the road surface (especially asphalt road surface), which is
convenient for paving the surface layer in the later stage.
3. Installation and fixation of manhole covers
Placement of manhole covers: When the concrete strength of the
manhole frame reaches the requirements (generally maintained for
about 7 days), multiple people will cooperate to gently place the
manhole cover on the manhole frame to ensure that it fits well and
there is no obvious gap, and check whether it is opened and closed
smoothly.
Fixed anti-theft: If equipped with bolts, tighten them with a
wrench; special locks can also be used to prevent vehicles from
rolling over and external forces from loosening and shifting,
anti-theft and ensuring safe use.
4. Finished product protection and acceptance
Water-tight test (applicable to rainwater and sewage wells):
Water-tight test shall be performed within 24 hours after
installation. The test water head is the upstream pipe top + 2m,
and the water seepage is ≤0.0046×D (D is the inner diameter of the
pipe, mm), and the sealing is tested.
Pavement restoration and cleaning: If it is on an asphalt pavement,
the area around the manhole cover is filled with asphalt to make it
smooth; cement pavement is repaired with concrete of the same
grade. Clean up the debris and tools on site, check the contact and
flatness between the manhole cover and the well frame, ensure that
there is no looseness or abnormal sound, and meet the load-bearing
and use standards.
Different projects have different designs and environments. For
example, in soft foundations and heavy-loaded industrial areas,
foundation reinforcement needs to be strengthened; strictly follow
the drawings, specifications and on-site instructions to ensure
installation quality.


If you are interested, please contact me.
I will give you a great discount price,I am online 24 hours a day.
|